Beginner Level Questions

1 / 7

What is the primary purpose of a Work Breakdown Structure (WBS)?

2 / 7

What does the Critical Path represent?

3 / 7

What is the first step when updating a schedule?

4 / 7

What is a baseline used for?

5 / 7

Total float is best described as:

6 / 7

Which relationship type means “Activity B starts when Activity A finishes”?

7 / 7

A milestone is typically defined as:

Your score is

The average score is 30%

0%

Intermediate Level Questions

1 / 7

What is a key sign of poor schedule logic?

2 / 7

In Primavera P6, “Retained Logic” means:

3 / 7

What is the purpose of resource loading a schedule?

4 / 7

A Level 3 schedule typically represents:

5 / 7

A schedule quality review should FIRST check for:

6 / 7

Which of the following is a valid reason to use constraints?

7 / 7

A baseline change should be approved when:

Your score is

The average score is 0%

0%

Advanced Level Questions

1 / 25

What is the purpose of Schedule Risk Analysis (SRA)?

2 / 25

A “multiple float path” analysis helps determine:

3 / 25

Resource leveling is used to:

4 / 25

When performing forensic schedule analysis, the FIRST step is to:

5 / 25

In Primavera P6, Global Change is used to:

6 / 25

Which scenario is BEST suited for Progress Override?

7 / 25

Why should LOE activities be excluded from schedule performance metrics?

8 / 25

What does excessive float on many activities typically indicate?

9 / 25

What is the MAIN benefit of coding activities consistently across projects?

10 / 25

A scheduler's MOST important responsibility in executive communication is to:

11 / 25

In forensic schedule analysis, what is the First step?

12 / 25

In p6,what determines which path is shown as the critical path?

13 / 25

Which scheduling option most affects behavior during out-of-sequence progress?

14 / 25

What is the PRIMARY risk of excessive use of hard constraints?

15 / 25

When should a Level of Effort (LOE) activity NOT be used?

16 / 25

Which p6 function allows scenario modeling without impacting the live schedule?

17 / 25

Negative float most commonly indicates:

18 / 25

What is the BEST method to identify near-critical activities?

19 / 25

Which condition most commonly causes a shifting critical path between updates?

20 / 25

What is the PRIMARY purpose of schedule normalization?

21 / 25

Which schedule quality metric is MOST important for claim defensibility?

22 / 25

What happens if calendars are changed AFTER baselining?

23 / 25

Which activity type SHOULD NOT drive the critical path?

24 / 25

What is the BEST practice for handling owner-mandated dates?

25 / 25

Which metric best indicates schedule realism?